Project Name: BMS System for Jordan Veterinary and Agriculture Medical Industrial Company “JOVET”
Project Description : complete BMS system for the new factory of the company JOVET
Our work in this project included the following :
- -Design oft he BMS system based on the HVAC desing in cooperation with the project consultant
- - Supply, installation supervision and commissioning of the complete BMS system including
- Sensor for temperature
- Sensors for humidity
- Pressure switches
- Sensors for air flow and room pressure monitoring g
- Three way mixing valves for the Air handling units
- Duct smoke detectors
- Programming and commissioning of the system
speical Project Features:
-Air Flow Monitring and control based on DPT Flow sensors and Frequency drives
-Data logging of the main parameters required by GMB standard
-